Overview
This How-To will demonstrate how to update the interview status of multiple interviews
Steps:
1. Open the operation console.
2. Get the desired interviews
3. Select desired interviews.
4. Press the ‘update status’ button:
5. Choose to new desired status
That’s it!
Visit us at: http://www.dooblo.net
Comments
When making this change, will all interviews that enter and fail to obtain an audio file have the same status?
Please sign in to leave a comment.